On February 29, 2020, Foss Maritime christened the Jamie Ann, the first of four new ASD-90 tugs being built by Nichols Brothers Boat Builders. The second tug Sarah Avrick, built for their subsidiary, AmNav, was launched in September 2020 and Leisa Florence was launched in November 2020. The final tug in the project, Rachael Allen was delivered in June 2021.
MER Equipment is proud to be involved with this Foss project and provide identical power generation for all four tugs.
Specifications
- MGP65-KT1, 65kW BOLLARD™ Sound Enclosure installed for ship power.
- 2- BOLLARD™, MGP122-KA1 generators set up for a parallel operation to the main buss.
- Gensets built with John Deere 6068AFM85, IMO 3 compliant engines and Marathon Mariner generator ends.